Pengaruh Evaluasi Grade Serta Jari Jari Tikungan dan Superelevasi Terhadap Produktivitas Alat Angkut Overburden pada Pit Pinang PT Bukit Baiduri
DOI:
https://doi.org/10.58169/saintek.v5i1.1067Keywords:
Cycletime, Oveburden, Productivity, Road geometry, SuperelevationAbstract
PT. Bukit Baiduri Energi (BBE) is a coal mining company that utilizes hauling roads as the main infrastructure for material transportation. This study focuses on a 1.7 km road segment selected as the object of technical evaluation. The objective of this research is to analyze the effect of road geometry improvements on hauling time efficiency and equipment productivity. The method employed includes direct field measurements and calculations of operational parameters such as travel time, cycle time, and productivity. The results indicate that improvements in road grade reduced travel time from 10.13 minutes to 9.86 minutes. This reduction was followed by a decrease in cycle time from 16.29 minutes to 16.22 minutes. In addition, productivity increased from 65.4 bcm/hour to 66.69 bcm/hour. Also, improvements in curve radius and superelevation were implemented on the hauling road. These improvements resulted in a further decrease in travel time from 9.86 minutes to 8.6 minutes. Consequently, the cycle time also decreased from 16.22 minutes to 16.18 minutes. The productivity of hauling equipment increased from 66.69 bcm/hour to 67.02 bcm/hour. Overall, the evaluation of road geometry provided a positive contribution to operational performance. The productivity of overburden removal increased from 65.4 bcm/hour to 67.02 bcm/hour, representing an improvement of 2.48%.
References
AASHTO. (2011). A policy on geometric design of highways and streets. American Association of State Highway and Transportation Officials.
Anwar, H. (2020). Evaluasi geometri jalan angkut tambang dari stockpile Tanjung Gunung ke Pit Damar Selatan pada penambangan batubara di PT Sebuku Iron Lateritic Ores (SILO) Kalimantan Selatan. Geosapta, 6(1), 1–11. https://doi.org/10.20527/jg.v6i1.7033
Kementerian Energi dan Sumber Daya Mineral. (2018). Keputusan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 1827 K/30/MEM/2018 tentang pedoman pelaksanaan kaidah teknik pertambangan yang baik. Kementerian Energi dan Sumber Daya Mineral Republik Indonesia.
Nanda, M. D. (2018). Kajian geometri jalan tambang berdasarkan AASHTO dan Kepmen No. 1827/K/30/MEM/2018 pada penambangan andesit di PT XYZ. Jurnal Riset Teknik Pertambangan, 1(1), 107–116.
Prodjosumarto, P. (1993). Pemindahan tanah mekanis. Jurusan Teknik Pertambangan, Institut Teknologi Bandung.
Putra, R. N., & Kasim, T. (2019). Evaluasi teknis geometri jalan angkut produksi sebagai upaya pencapaian target produksi batubara 20.000 ton/bulan di tambang terbuka PT Allied Indo Coal Jaya (AICJ). Jurnal Bina Tambang, 4(3), 77–88.
Rahman, A. S. (2022). Alat angkut dalam menangani penggalian overburden di PT Adaro Indonesia [Skripsi, Universitas Islam Negeri Antasari].
Santoso, E. (n.d.). Optimalisasi produktivitas alat angkut [Naskah tidak dipublikasikan].
Soludale, N. (2017). Jurnal siartek. Siartek, 3(1), 1–10.
Sudarmadji, R. A. (2023). Pengaruh swing angle terhadap produktivitas alat gali muat pada kegiatan penambangan andesit di PT Lotus SG Lestari. Jurnal Pertambangan, 1–10.
Suwandhi, A. (2004). Perencanaan jalan tambang. Dalam Diklat perencanaan tambang terbuka (pp. 12–22).
Utama, K. H., Adnyano, A. A., & Mukarrom, F. (2021). Kajian teknis produktivitas alat gali muat dan angkut pada batu tras. Mining Insight, 2(2), 61–70.
Veronika Neny, V., Nirmala, A., & Syafrianto, M. K. (2023). Evaluasi geometri jalan angkut tambang berdasarkan standar AASHTO pada penambangan batu granit PT Hansindi Mineral Persada Kabupaten Mempawah Provinsi Kalimantan Barat. JeLAST: Jurnal Teknik Kelautan, PWK, Sipil, dan Tambang, 10(1), 1–8.
Wijaya, T. M. (2018). Skripsi teknik sipil [Skripsi sarjana].
Yusup, D., Purnomo, H., Mohamad, M. A., & Putra, B. P. (2022). Kajian teknis geometri jalan angkut pada kegiatan pengupasan overburden PT Bara Prima Pratama Kabupaten Indragiri Hilir Provinsi Riau. Prosiding Nasional Rekayasa Teknik Pertambangan, 1–10.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Sains dan Teknologi

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.








