Analisis Produktivitas Pekerja Pada Pekerjaan Pondasi dan Pemasangan Batu Bata Dengan Metode Work Study
DOI:
https://doi.org/10.58169/jusit.v1i2.288Keywords:
work study method, AHSP 2021, Productivity, costAbstract
Work productivity is an element where the success of a project requires effective time and cost. This study aims to determine the productivity of foundation and brick workers. The work study method is an operations management technique used to increase work efficiency. The results of the analysis on foundation work with 2 groups (1 worker and 1 worker) using work study and AHSP 2021 for 1m3 with 1:3:10 specs obtained a productivity of 12.92 1m3 for 3 working days with a cost per 1m3 using the work study method, namely Rp.639,306 and AHSP 2021 Rp.782,517 with a difference of Rp. 143,211. The total cost of workers in foundation work using the work study method is IDR 8,257,273 and the 2021 AHSP is IDR 10,106,990 with a difference of IDR 1,849,717. In brick work with 1 group (1 mason 1 worker) using work study and AHSP 2021 for 1m2 with 1:3:10 specs, the productivity is 106.99 m2 for 9 working days with a cost per 1m2 using the work study method, namely Rp.60,696 and AHSP 2021 Rp.68,834 with a difference of Rp.8,138. The total cost of workers on brick work using the work study method is IDR 6,488,408 and AHSP 2021 is IDR 7,358,312 with a difference of IDR 869,904.
References
Putra, E., & Sulistio, H. (2020). PRODUKTIVITAS PEKERJA DALAM PEKERJAAN PEMASANGAN DINDING BATA DENGAN METODE CREW BALANCE CHART. JMTS: Jurnal Mitra Teknik Sipil, 3(3). https://doi.org/10.24912/jmts.v3i3.8352
Unas, S. El, Puspa N., K., & Yudha, R. R. P. (2015). Analisa Produktivitas Pekerjaan Dinding Panel, Dinding Batu Bata Konvensional, Dan Sni Pekerjaan Dinding. Jurnal Mahasiswa Jurusan Teknik Sipil, 1(2).
Cahyadi, H., Purnamasari, E., & Nordiansyah, M. (2021). Perhitungan Produktivitas Pekerjaan Pemasangan Dinding Bata Ringan dengan Metode Time Study pada Proyek Pembangunan Ruang Kantor Sekolah Menengah Atas Negeri 5 Banjarmasin. Seminar Nasional Inovasi Teknologi Terapan (SNITT) 2021.
Harun, M. (2013). ANALISA PRODUKTIFITAS TENAGA KERJA PADA PEKERJAAN KONSTRUKSI GEDUNG. Jurnal Ilmiah MITSU, 1(2). https://doi.org/10.24929/ft.v1i2.60
Goritman, B., Irwangsa, R., & Kusuma, J. H. (2012). Studi Kasus Perbandingan Berbagai Bata Ringan dari Segi Material, Biaya, dan Produktivitas. Pratama Teknik Sipil, (Clc).
Abubakar, Y., Wunas, S., Tjaronge, W., & Djamaluddin, R. (2017). Model Koefisien Produktivitas Pekerjaan Pemasangan Bata Ringan Pada Perumahan Sederhana. In Seminar Nasional Sains dan Teknologi 2017.
Sudari, W. (2013). Perbandingan Produktivitas Tenaga Kerja yang Berbeda Latar Belakang Kebudayaan Dengan Metode Time Study dalam Proyek Konstruksi Bangunan Gedung. FT UI.
Mufida, M., Seputro, H., & Romli, M. (2019). EVALUASI METODE KERJA PEKERJAAN PEMASANGAN BATA DENGAN MENGGUNAKAN METODE TIME AND MOTION STUDY. SISTEM Jurnal Ilmu Ilmu Teknik, 15(3). https://doi.org/10.37303/sistem.v15i3.196
Sugiyanto, S., & Wena, M. (2020). PREDIKSI PRODUKTIFITAS KERJA PADA PEKERJAAN TANAH DAN PONDASI BANGUNAN TAK BERTINGKAT. BANGUNAN, 25(2). https://doi.org/10.17977/um071v25i22020p11-24
Yanti, G. (2017). PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK SAMPLING PROYEK PERUMAHAN DI KOTA PEKANBARU. SIKLUS: Jurnal Teknik Sipil, 3(2). https://doi.org/10.31849/siklus.v3i2.385
Anwar dkk. (2019). PONDASI BATU KALI. Angewandte Chemie International Edition, 6(11), 951–952., 4(2).
Sari, S. N. (2019). Evaluasi Anggaran Biaya menggunakan Batu Bata Merah dan Batu Bata Ringan Gedung Kantor Kelurahan Bareng Kecamatan Klaten Tengah Kabupaten Klaten. Jurnal Qua Teknika, 9(1). https://doi.org/10.35457/quateknika.v9i1.635
Soeparyanto, T. S., Ikhsan, A. Al, Sulha, S., Mursidi, B., & Statiswaty, S. (2021). PENINGKATAN KOMPETENSI DAN KINERJA TUKANG PADA PEKERJAAN PASANGAN BATA DENGAN ALAT BANTU. INTEGRITAS : Jurnal Pengabdian, 5(1). https://doi.org/10.36841/integritas.v5i1.849
Tjakra, L. H. T. J., & Malingkas, G. Y. (2020). Metode Pelaksanaan Pekerjaan Dinding Pasangan Bata Ringan Dan Plesteran Pada Pekerjaan Proyek Office and Distribution Centre Pt.Sukanda Jaya Airmadidi-Minahasa Utara. Jurnal Sipil Statik, 8(ISSN: 2337-6732).
Agusman, A., & Dasmita, D. (2018). Analisis Perbandingan Biaya dan Waktu Menggunakan Batu Bata Merah dengan Batako Press Pada Rumah Type 60, Perumahan Asri Wijaya. SCEJ (Shell Civil Engineering Journal), 3(1). https://doi.org/10.35326/scej.v3i1.1048
Anam, C., & Sugiyanto, S. (2022). ANALISA EFISIENSI PENGGUNAAN BATA MERAH DIBANDING BATA RINGAN PADA PROYEK PEMBANGUNAN GEDUNG MADRASAH TSANAWIYAH SALAFIYAH KEREK TUBAN. Rang Teknik Journal, 5(2). https://doi.org/10.31869/rtj.v5i2.3119
Asmaroni, D. (2020). Analisa Kualitas Pekerjaan Dinding Dengan Bata Merah dan Bata Ringan (Studi Kasus : Perumahan Type 46 Di Kabupaten Pamekasan). Rekayasa: Jurnal Teknik Sipil, 5(1). https://doi.org/10.53712/rjrs.v5i1.857
Abdul Hamid Mahdy, V. A. (2021). ANALSISIS PRODUKTIVITAS TUKANG BATU BATA PADA PEKERJAAN DINDING BATA MERAH. Civil Engineering, 47(4).
Yendri, O. (2022). Analisis Korelasi Antara Komposisi, Ukuran dan Harga Bata Merah di Kabupaten Musi Rawas Provinsi Sumatera Selatan. JATI UNIK : Jurnal Ilmiah Teknik Dan Manajemen Industri, 5(2). https://doi.org/10.30737/jatiunik.v5i2.2454
Kartika, N., Robial, S. M., & Pratama, A. (2021). ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN KOLOM DI PROYEK PEMBANGUNAN GEDUNG PEMDA KABUPATEN SUKABUMI. JURNAL MOMEN TEKNIK SIPIL, 3(2). https://doi.org/10.35194/momen.v3i2.1207