Modifikasi Perencanaan Pondasi Borepile Sebagai Alternative Pengganti Pondasi Minipile Proyek Gedung Madrasatul Qur’an Jombang
DOI:
https://doi.org/10.58169/jusit.v1i2.181Keywords:
Borepile Foundation, Mayerhoff, Implementation MethodAbstract
The Borepile Foundation and the Implementation Method for the Madrasah Aliyah Madrasatul Qur’an Tebuireng Jombang Building Project, is one of the deep foundation. The use of borepile foundation is an alternative to minipile foundation. Calculation of building weight using the SAP2000 program. The points reviewed are points S-1 and points S-2. Pile bearing capacity analysis using the Mayerhoff method. By using sondir soil evidence (CPT). The construction of the Madrasah Aliyah Madrasatul Qur’an Tebuireng uses a diameter of 80 cm for borepiles with a depth of 11 m and has 23 D22 reinforcement. There are 4 types of pile caps in the borepile. The dimensions of each pile cap, namely PC-1, PC-2, and PC-4, are 150 cm x 150 cm, while PC-3 is 150 cm x 100 cm. For reinforcement in the x-axis direction of 22 D22 – 150 mm, reinforcement in the y-axis direction of 24 D22 – 160 mm. In the implementation method using a mini borepile because it considers aspect of heavy equipment mobilization. Some of the work in progress includes measuring, making reinforcement, drilling, installing reinforcement, casting, and making pile caps.
References
Andriansyah, M. N. (2021). Analisis Perbandingan Pondasi Tiang Pancang Dengan Pondasi Tiang Bor Pada Proyek Pembangunan Puskesmas Paripurna Karangkembang Di Kecamatan Babat. DEARSIP: Journal of Architecture and Civil, 1(2), 43–52.
Disa, E., Sholeh, M., & Aponno, G. (2021). Studi Alternatif Perencanaan Pondasi Tiang Bor Fakultas Farmasi Universitas Airlangga Surabaya. Jurnal JOS-MRK, 2(1), 137–142. https://doi.org/10.55404/jos-mrk.2021.02.01.137-142
Hakim, F. Al. (2021). Analisis Daya Dukung Pondasi Bore Pile Berdasarkan Data Sondir Pada Proyek Pembangunan Instalasi Ibu Kota Kecamatan (Ikk) Perusahaan Daerah Air Minum (Pdam) Kabupaten Tanah LautSkripsi. Universitas Islam Kalimantan Muhammad Arsyad Al Banjari.
Iqbal, M., Aponno, G., & Novianto, D. (2023). ANALISIS PERBANDINGAN PONDASI TIANG PANCANG DAN PONDASI TIANG BOR PADA PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN KEDIRI. Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK), 4(1), 174–178.
Irwanto, T. J., Suryani, N. L., Ramdha, B. V., Rahman, A., & Ihsan, M. A. N. (2023). Metode Pelaksanaan Pekerjaan Pondasi Bore Pile Pada proyek Gedung Baru Instalasi Pelayanan Utama Rumah Sakit Dr Saiful Anwar Malang. Jurnal Pengabdian Teknik Dan Sains (JPTS), 3(01).
Jali, A., & Wibowo, P. H. (2023). Analisis Pelaksanaan Pekerjaan Pondasi Bored Pile Pada Proyek Pembangunan Apartemen Monde City. Jurnal Ilmiah Rekayasa Sipil, 20(1), 10–18.
Nasution, D., Indera, E., & others. (2022). Modifikasi Perencanaan Pondasi Tiang Pancang Sebagai Alternative Pengganti Pondasi Bore Pile Pada Nagoya Hill Hotel Ditinjau Dari Metode Kerja, Daya Dukung Dan Biaya Pelaksanaannya. Zona Teknik: Jurnal Ilmiah, 16(1).
Pratama, P., Pasaribu, B., & Simbolon HT, R. (2022). Perhitungan Daya Dukung Rencana Pondasi Bore Pile Pada Perencanaan Pembangunan Kantor Balai/Pos Pelayanan Penegakan Hukum Di Jl Sisingamangaraja Medan Berdasarkan Sondir, SPT Dan Boring. Jurnal Teknik Sipil (JTSIP) : Vol. 1 No. 1 Juni 2022, 1(1), 21–27.
Primaswari, G., Utama, A. B., & Taurano, G. A. (2022). PRODUKTIVITAS HYDRAULIC STATIC PILE DRIVER PADA PROYEK PEMBANGUNAN WORKSHOP DI SEMARANG. Orbith: Majalah Ilmiah Pengembangan Rekayasa Dan Sosial, 18(1), 11–21.
Virganinda, M., & Gaol, A. L. P. L. (2021). ANALISIS KEKUATAN TIANG PANCANG SPUN PILE PADA ABUTMENT JEMBATAN ANJIR SERAPAT KM. 11 (Strength Analysis Of Spun Pile At Anjir Serapat Bridge Abutment Km. 11). Huma Tabalien Jurnal (HTJ) Teknik Sipil, 1(2), 1–11.